mould supplier China mold maker toolmaker

Frequently Asked Questions

Thank you for visiting! We’re thrilled to see your interest in high-quality molds. As a valued customer, we know you appreciate top-notch information, so we’ve gathered some frequently asked questions to help you learn more about TONGDA LINK — your trusted partner in plastic injection molds and injection molding solutions.

If you have any questions not covered here, don’t hesitate to reach out! We’re always ready to assist you in making informed decisions for your projects.

Click here to email us, or call us at +86-13554761695 — we’re available 24/7!

1. When was TONGDA LINK Plastic Mold company Founded?

TONGDA LINK is a China mold maker, and we started in the year 2008 as a injection mold supplier worldwide.

2. How many employees does TONGDA LINK have?

TONGDA LINK MOLD factory operates with 39 staff members across two shifts. The workforce comprises 25 employees in mold manufacturing and 12 employees dedicated to injection molding. The engineering department includes 3 mold designers, 2 project engineers, and 2 CNC programming engineers.

3. What has your company revenue been for each of the past 5 years?

The average revenue is around 2.6-3.2 million USD per year.

4. How is TONGDA LINK mold company's manufacturing capacity for plastic molds, plastic injection molding, and CNC machining manufacturing per year?
TONGDA LINK has the capacity to manufacture 360 sets of molds annually. 
We support molding production with 7 fully automated injection molding machines, ranging from 80T to 280T, operating 24/7 in-house. And manufacturing capacity for plastic injection molding products is 0.5 million pcs per month.
The CNC machining manufacturing capacity is 38,000pcs per year.
5. What is the average lead time for plastic tooling?

At TONGDA LINK, our efficient mold manufacturing team is dedicated to providing customers with rapid delivery and exceptional injection mold quality.

Typically, delivery times vary based on the plastic product’s structure and the complexity of the mold. Here’s what you can expect:

  • Small and medium-sized molds: approximately 3 weeks
  • Precision molds: approximately 5 weeks
  • Large molds: approximately 7 weeks

This means that, in general, delivery times range from 3 to 8 weeks depending on project specifications.

6. How many plastic tooling engineers on staff does TONGDA LINK mold have?
TONGDA LINK team has 25 mold manufacturing technicians, and 3 mold designers, 2 project engineers, and 2 CNC programming engineers.
TONGDA LINK has the capacity to manufacture 360 sets of molds annually. 
Project engineers are in charge of plastic mold manufacturing, following the manufacturing process and providing solutions for problems in production.
Two quality engineers for plastic mold making quality control, mold inspection, plastic injection molded parts checking, etc.
7. How many CAD designers on staff does TONGDA LINK company have?
TONGDA LINK Mold Company has a team of three CAD designers responsible for creating 2D drawings for plastic molds.
8. What software does TONGDA LINK use for plastic mold engineering and manufacturing?

TONGDA LINK use AutoCAD, Pro/E, Unigraphics NX, CATIA, and Solidworks for plastic mold engineering and designing. And use MoldFlow to analyze mold design and optimize the design.

9. How many members does the TONGDA LINK quality control team have?

TONGDA LINK quality department has four members for IQC, OQC, IPQC, OPQC, and FQC.

And also has two engineers for plastic mold manufacturing management and quality control role in the actual mold manufacturing.

10. How are TONGDA LINK DFM capabilities during plastic tool making?
TONGDA LINK provides a Design for manufacturability (DFM) report for every plastic mold project. This report thoroughly analyzes key factors such as parting lines, gate positions, draft angles, wall thickness, injection systems, slides and lifters, as well as texturing and engraving.

Based on the DFM analysis, TONGDA LINK will recommend modifications to the plastic part design and send a proposal to the customer, helping to optimize the plastic injection molding process.

11. Can TONGDA LINK deliver plastic molds to customers on time?

TONGDA LINK adheres to production timelines and ensures that the first mold trial (T1) is conducted on schedule.

However, before mold delivery, there are certain details that may require customer confirmation, which can sometimes introduce unpredictable factors. TONGDA LINK remains committed to cooperating fully with customers, working to facilitate a swift delivery process whenever possible.

12. Can TONGDA LINK company perform a plastic tool evaluation or mold validation? Such as tool FAI or CPK test?

TONGDA LINK collaborates closely with customers to conduct mold validation, following a comprehensive injection molding process validation protocol to assess mold performance. Please note that there is an additional cost associated with this service.

The validation procedure includes three key phases:

  1. Installation Qualification (IQ)
  2. Operational Qualification (OQ)
  3. Performance Qualification (PQ)

TONGDA LINK provides all relevant data, including First Article Inspection (FAI) and CPK test results for molding samples, ensuring transparency and quality assurance throughout the process.

13. Can TONGDA LINK perform FAI, and provide the report?

After each mold trial, TONGDA LINK will provide a report detailing the dimensions of 3 to 5 shots of the injection molded samples.

Additionally, TONGDA LINK delivers First Article Inspection (FAI) reports to customers prior to the start of injection molding production. We also perform Production Part Approval Process (PPAP) for each batch of plastic molded parts to ensure quality and compliance.

14. What`s the plant area of TONGDA LINK injection mold factory?
TONGDA LINK factory covers around 37,640.00 sq.ft
15. What are CNC machines equipped in the TONGDA LINK mold factory?

TONGDA LINK mold factory is equipped with 10 CNC machines, offering machining precision of up to 0.002mm.

16.What are EDM machines equipped in the TONGDA LINK mold factory?

TONGDA LINK mold factory is equipped with 5 sets of EDM. The tolerance can reach ±0.002mm.

17. What are grinding machines equipped in the TONGDA LINK mold factory?

TONGDA LINK injection molding factory is equipped with 5 sets of grinding machines. The tolerance can reach ±0.003mm.

18. What are plastic injection molding presses equipped in the TONGDA LINK molding factory?

TONGDA LINK molding factory equipped with 7 sets of plastic injection molding machines, from 80 Ton to 280 Ton. 

19. What`s the clamping tonnage range of molding machines in the TONGDA LINK molding facilities?

TONGDA LINK molding factory equipped with injection molding machines from 80-280 tons.

20. What are CMM equipped in the TONGDA LINK molding factory?

TONGDA LINK molding factory equipped with two sets of CMM of the brand HEXAGON.

21. What process does TONGDA LINK company use to ensure the parts or raw materials are purchased from a reputable/qualified source with adequate certification?

TONGDA LINK has a quality department with three members in charge of IQC, OQC, IPQC, OPQC, and FQC.

TONGDA LINK also has strict supplier evaluation procedures and management to ensure the suppliers are qualified.

TONGDA LINK suppliers can provide certificates, MSDS, and datasheets for all steel or plastic materials.

22. What AS/ISO/TS certifications does TONGDA LINK mold company has?

TONGDA LINK mold factory is ISO13485 certified, ISO9001 certified, and IATF16949 certified.

23. What industries does TONGDA LINK mold company work with (e.g., industrial, consumer electronics, aerospace, defense, automobile, automation, medical device, life science, etc.)?

TONGDA LINK makes plastic molds for many industries, such as Automotive, Medical, Electronics, Consumer, Industrial, Aerospace, and more.

To learn more details, please visit the TONGDA LINK mold application.

24. Does TONGDA LINK mold capable of plastic overmold or 2K/3K injection mold manufacturing?

TONGDA LINK is also capable of plastic overmold manufacturing and 2K/3K injection mold.

To learn more about plastic overmolding, please read the blog about plastic overmolding.

25. Can TONGDA LINK mold company polish plastic tools to SPI or European standards?

TONGDA LINK mold factory manufactures plastic molds according to customer’s requirements, and the polish will be according to SPI-SPE standards or European standards.

Click here to learn more about SPI-SPE plastic mold classifications and standards.

26. Does TONGDA LINK injection molding factory use the USA or European standard components, if required by the customer?

TONGDA LINK mold support DME, HASCO equivalent mold components for plastic tool making. To make sure customers can do routine mold maintenance after importing the mold.

27. What hot runner brands does the TONGDA LINK mold factory work with?

TONGDA LINK mold factory works with worldwide famous hot runner suppliers.

Usually, YUDO takes 40%, INCOE takes 35%, DME takes 10%, MOLD-MASTERS is 8%, HASCO is 1%, HUSKY is 1%, SYNVENTIVE 5%, etc.

28. What texture suppliers do the TONGDA LINK mold factory work with, especially for automotive mold manufacturing?

TONGDA LINK mold factory works with the Mold Tech texture and YS texture company.

Didn’t find an answer to your question?

TONGDA LINK Injection Molding Factory Video Support

About Plastic Tool Making and Injection Molding Process

How to assemble a plastic mold?

Experience

How to install a mold on the injection molding machine?

Experience

How to do daily maintenance of plastic molds?

Experience

How to package a plastic mold before delivery?

Experience

How to make a quality inspection of a mold before package?

Experience

How to work with TONGDA LINK regards plastic mold & injection molding projects?

Experience